Up-rate Study for the Corps of Engineer’s 29.47 MVaa
Generator/Motor. Found to be feasible to up-rate to 36.37 MVa.
Turbine Shaft Coupling to Switch Yard Up-rate study for the Consumer
Power Companys’ 325 MVa Unit as a Sub-Contract to
Devine-Tarbel & Associates (DTA). Found to be feasible to
up-rate to 455 MVa.
Partial Up-rate Study for First Light’s 235 MVa
Generator/Motor as a Sub-Contract to Essex Partnership. Found to be
feasible to up-rate to 333 MVa.
Partial Up-rate Study for Oglethorpe Power’s 314 MVa
Generator/motor as a Sub-Contract to American Hydro. Found to be
feasible to up-rate to 406 MVa.
Performed a risk analysis on the 389 MVa Dominion Resources Generator/
Motor.
Testing:
Loss, Excitation, and Heat Runs on Oglethorpe Power Companys’
314 MVa Generator/Motor as a Sub-Contract to American Hydro
Loss, Excitation, and Heat Runs on Consumer Power Companys’
324 MVa Generator/Motor as a Sub-Contract to DTA
Heat Runs on Consumer Power Companys’ 648 MVa Transformers
and Bus Duct as a Sub-Contract to DTA
Manufacturing:
4 Thrust Bearing Heating Systems as a Sub-Contract to DTA
3 Oil Omission Systems as a Sub-Contract to DTA/ Duke Energy
72 Refurbished Surface Air Coolers for the Corps of Engineers
2 Sets of Refurbished Surface Oil Coolers for the Corps of Engineers
2 New Sets of Surface Oil Coolers for the Corps of Engineers
2 New Surface Oil Coolers for Voith-Siemens
16 New Surface Air Coolers complete with Supports for
Voith-Siemens
Site Refurbishment:
Dismantled three 3.5 MVa generators and Turbines for Pennsylvania Coil/
City of Danville. Reinstalled three 4.25 MVa refurbished Generators and
Turbines.
Refurbished the voltage gradient system on 50% of the Stator Coils at
the 52.6 MVa Kingsley Plant for Central Nebraska Public Power Irrigation
District.